GNW Test Session #2

Last week we had the second test run of the new GNW!  The biggest addition in this session was to test run the train sequence.  Seemed to work OK, but some tweaking to do.  All in all though, I think everyone had fun.  Kudos to operators Meeker, Kampsnider, Kersting and Mr/Mrs Botkins for tolerating trains without ANY blocked cars!  And then 2 switchers decided to poop out.  It was truly a pain and they took it all in stride.








Comments

Popular posts from this blog

Configuring Push-buttons for Turnout Control in LCC (with BONUS section on Adapting JMRI for Feedback)

Let’s Configure a Node – The Beauty of LCC (With a bonus section on connecting LCC to PanelPro)

LCC and Wiring Continues