Walls are coming down!

Walls of the 2 bedrooms are coming down, preparing the area for expansion.





A date on the back of a sheet of drywall tells of the time when I put these walls up.  My how time flies!



Next comes demo'ing part of the existing layout.  Emptied the staging yards and moved as much over to the remaining sections as possible.

Cerro Vista and Warm Springs are definitely looking like storage yards now!




Pic of the last train run on GNW Phase 2, moving off to storage.


More to come as work progresses!

Comments

Popular posts from this blog

Let’s Configure a Node – The Beauty of LCC (With a bonus section on connecting LCC to PanelPro)

Configuring Push-buttons for Turnout Control in LCC (with BONUS section on Adapting JMRI for Feedback)

LCC and Wiring Continues